Menu
Log in

BMP 5.2 and Dismantling BMP

The AFRA Best Management Practices

Effective January 1, 2026, the Aircraft Fleet Recycling Association (AFRA) has released Revision 5.2 of the Best Management Practice (BMP) Guides for Management of Used Aircraft Parts and Assemblies for Disassembly and Recycling along with a new stand-alone BMP for Dismantling. 

These BMP Guides establish industry standards for the management and disassembly of used aircraft parts and assemblies, aircraft dismantling, and the recycling of aircraft materials at the end of their service life and are used together for audit preparation and AFRA accreditation, as applicable to each scope.

Supporting Resources

Each BMP is accompanied by:

  • Audit Guidance Checklists Provides a structured framework to assess conformity with BMP standards during audits. 
  • Practice Guides with Minimum Standards Defines the minimum requirements necessary to meet BMP criteria.
  • AFRA ESD Best Practice Document Provides guidance on environmentally sustainable disassembly practices.
  • AFRA Form 0: Asset End-of-Life Certificate A standardized form for certifying the responsible end-of-life management of aircraft assets.

BMP Documents and Supporting Resources

    Disassembly BMP | revision 5.2 | Effective January 1, 2026

    Establishes requirements for the management, identification, traceability, and documentation of used aircraft parts and assemblies removed during disassembly activities.

    Dismantling BMP | revision 0 | Effective January 1, 2026

    Defines standards for the controlled dismantling and disposal of non-recoverable aircraft, including safety, environmental controls, and end-of-life documentation.

    Recycling BMP | revision 5.2 | Effective January 1, 2026

    Outlines requirements for the environmentally responsible recycling and disposition of aircraft materials at the end of their service life.

    Supporting Resources

      Implementation Timeline

      • Release Date: January 1, 2026 
      • Transition Period: Six months for current BMP accredited clients 
      • Full Compliance Deadline: July 1, 2026 - All audits after this date will be conducted to BMP 5.2 (and the Dismantling BMP, where applicable)
      • New Accreditation Clients: All initial audits for Disassembly and Recycling will be conducted to BMP Revision 5.2.
        For questions regarding the AFRA BMP please contact AFRA Staff
        Global Leader in Sustainable Aircraft Recycling

        Contact

        © 2025 Aircraft Fleet Recycling Association.

        Website by Nicasio LLC

        Powered by Wild Apricot Membership Software